Desorption
- Core handling and core description
- Gas Canister Desorption: Temperature controlled desorption (e.g. canister baths)

Desorption-Equipment: developed & constructed by our partner GEOKRAK
Gas Content Determination:
- Total sorbed gas content (desorbed gas + lost gas + residual gas)
- Desorption at well site and in lab for cumulative volume of gas over time
- Lost Gas Calculation to extrapolate gas lost while tripping out of the hole
- Residual Gas per gram of crushed rock after desorption curve has flattened